Modelos de sistemas MRP cerrados integrando incertidumbre
In this paper, we present four models of uncertainty in the MRP closed systems in the production components, such as: manufacturing capacity of each product, delivery time and inventory availability. These parameters are processed by the fuzzy logic by modeling an MRP closed system deterministic. Th...
Saved in:
Institution: | Universidad EIA |
---|---|
Main Authors: | , , |
Format: | Artículo de revista |
Language: | Español |
Published: |
Fondo Editorial EIA
2013-11-06
|
Subjects: | |
Online Access: | https://repository.eia.edu.co/handle/11190/113 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|